Sewage Bypass at Dubai Downtown

Over pumping for existing Network Upgrade

We have installed, commissioned and operated a temporary over pumping system at Down Town Dubai to facilitate construction of service tunnels and roads in the area. The existing sewer network was diverted through our temporary setup. The pumping station had a peak flow of 1500 m3/hr.