Sewage Bypass at Dubai Downtown

Over pumping for existing Network Upgrade

We have installed, commissioned and operated a temporary over pumping system at Down Town Dubai to facilitate construction of service tunnels and roads in the area. The existing sewer network was diverted through our temporary setup. The pumping station had a peak flow of 1500 m3/hr.

Features

  • Sewage
Share

Related Projects

Stormwater Bypass, Nakheel Metro Station

Stormwater Bypass, Nakheel Metro Station

Storm Water over pumping near Nakheel Metro Station

Sewage Over Pumping, Al Samha

Sewage Over Pumping, Al Samha

Over pumping works for a sewage bypass in the Al Samha region, as requested by the ADSSC (Abu Dhabi Sewerage Services Company)

Sewage Over Pumping, Dubai Hills

Sewage Over Pumping, Dubai Hills

Dubai Hills required sewage bypassing during upgrading of the main pumping station in the area. WJ Groundwater were enlisted to carry out this project.