Over pumping for existing Network Upgrade
We have installed, commissioned and operated a temporary over pumping system at Down Town Dubai to facilitate construction of service tunnels and roads in the area. The existing sewer network was diverted through our temporary setup. The pumping station had a peak flow of 1500 m3/hr.
Related Projects

Sewage Over Pumping, Al Samha
Over pumping works for a sewage bypass in the Al Samha region, as requested by the ADSSC (Abu Dhabi Sewerage Services Company)

Stormwater Bypass, Nakheel Metro Station
Storm Water over pumping near Nakheel Metro Station

Sewage Over Pumping, Dubai Hills
Dubai Hills required sewage bypassing during upgrading of the main pumping station in the area. WJ Groundwater were enlisted to carry out this project.