
Over pumping for the upgrade of existing Metro Station
Description: The Nakheel Harbour and Tower (NHT) Station upgrade is a part of the Dubai Metro expansion works and it is located on Ibn Battuta Street. The Red Line Metro extension to Expo 2020 site shall intersect at NHT Station. WJ Groundwater Limited undertook the storm water & sewage over pumping works using our high capacity diesel centrifugal pumps. We installed our heavy-duty temporary HDPE discharge bypass lines up to 250m in length. The over pumping system was operated and monitored by WJ personnel continuously throughout the project. A flowmeter was used to monitor the system flow rate. WJ Groundwater has also successfully executed and installed our advanced deep line plugging system to divert flows.
Related Projects

Sewage Over Pumping, Al Samha
Over pumping works for a sewage bypass in the Al Samha region, as requested by the ADSSC (Abu Dhabi Sewerage Services Company)

The Garden Sewage Treatment Works
The Garden Sewage Treatment Works

Stormwater Bypass near Jumeirah
Storm Water over pumping near Jumeirah